Apply for an electricity transmission-line survey licence
A plain-language Nepal guide for developers and utilities studying a new transmission line who need to prepare a transmission survey licence, with evidence, submission, safety, and official-source checks.
Independent guide, not an official website
Nepal Docs Guide is not affiliated with the Government of Nepal. This guide helps you prepare, but official portals and offices control final rules, fees, forms, and timelines.
Quick answer
To prepare a transmission survey licence, prepare route and substation concept, voltage and capacity, company and technical capability, land, forest and environmental screening, confirm the current process with the Department of Electricity Development, ERC and relevant grid utility, complete the official application, and keep the receipt or reference for follow-up.
Eligibility
- Developers and utilities studying a new transmission line
- Applicants who need to prepare a transmission survey licence using matching and genuine records
- An authorized representative only when the responsible authority accepts representation
Required documents checklist
- □ Licensed company, promoter, project or authorized representative identity
- □ route and substation concept
- □ voltage and capacity
- □ company and technical capability
- □ land, forest and environmental screening
- □ Official DoED, ERC, NEA or project application and licence reference
- □ Official licence, regulatory, study, grid or service fee receipt
- □ Any correction, consent, authorization, or supporting record required for your specific case
Step-by-step process
- Confirm that the Department of Electricity Development, ERC and relevant grid utility is the correct authority for this request.
- Compare names, dates, addresses, registration numbers, account numbers, and other identifiers across route and substation concept, voltage and capacity, company and technical capability, land, forest and environmental screening.
- Define the corridor and connection purpose, submit the route study plan, coordinate with grid owners, and record alternatives and affected land.
- Submit through the official portal or office and pay only through the approved channel.
- Save the application number, receipt, uploaded-file copies, and any written instruction for follow-up.
Fees and timelines
- Do not rely on an old fee screenshot or an agent's estimate. Check the latest official notice, citizen charter, portal, or responsible office before paying.
- Processing time depends on document matching, office workload, inspection, examination, technical review, or approval level. Keep the receipt and follow-up reference.
Common mistakes
- Using an old form, notice, fee, or unofficial link
- Submitting incomplete or mismatched route and substation concept, voltage and capacity, company and technical capability, land, forest and environmental screening
- Paying an unofficial person or personal account without an official receipt
- Ignoring the difference between a new application, renewal, correction, duplicate, verification, or transfer
- A corridor crossing forest, settlements, airports or infrastructure can require several independent approvals.
Confirm the current electricity licence, grid code, PPA and regulatory filing requirement
This is an independent preparation guide, not an official notice, legal opinion, professional licence, approval, or guarantee. Requirements can change. Confirm the current form, fee, deadline, jurisdiction, and eligibility with the responsible authority before submitting.
To prepare a transmission survey licence, prepare route and substation concept, voltage and capacity, company and technical capability, land, forest and environmental screening, confirm the current process with the Department of Electricity Development, ERC and relevant grid utility, complete the official application, and keep the receipt or reference for follow-up.
Who this guide helps
Developers and utilities studying a new transmission line Applicants who need to prepare a transmission survey licence using matching and genuine records An authorized representative only when the responsible authority accepts representation
Why this document or approval matters
A corridor crossing forest, settlements, airports or infrastructure can require several independent approvals.
Evidence to prepare
- Licensed company, promoter, project or authorized representative identity
- route and substation concept
- voltage and capacity
- company and technical capability
- land, forest and environmental screening
- Official DoED, ERC, NEA or project application and licence reference
- Official licence, regulatory, study, grid or service fee receipt
- Any correction, consent, authorization, or supporting record required for your specific case
A safe step-by-step process
- 1Confirm that the Department of Electricity Development, ERC and relevant grid utility is the correct authority for this request.
- 2Compare names, dates, addresses, registration numbers, account numbers, and other identifiers across route and substation concept, voltage and capacity, company and technical capability, land, forest and environmental screening.
- 3Define the corridor and connection purpose, submit the route study plan, coordinate with grid owners, and record alternatives and affected land.
- 4Submit through the official portal or office and pay only through the approved channel.
- 5Save the application number, receipt, uploaded-file copies, and any written instruction for follow-up.
The decision point most applicants miss
Confirm voltage, endpoints, ownership, shared use, right of way, substation needs and whether it is project-dedicated or grid infrastructure.
After submitting
- Check the spelling and reference number on the acknowledgement or receipt.
- Track the application only through the official portal, SMS, email, or office contact.
- Respond to a deficiency notice with the requested evidence rather than creating a duplicate application.
- Keep the final certificate, licence, approval, account update, or rejection reason with the supporting records.
Avoid document and payment shortcuts
Do not alter certificates, hide mismatches, upload another person's records, share passwords or OTPs, pay an unofficial personal account, or accept a promise of guaranteed approval. Use the official portal and keep payment and submission evidence.
What was verified from the official source
The official department site lists survey and generation licences and applications for hydro, solar, wind, biomass, thermal, cogeneration and transmission-line projects, together with notices, citizen-charter and project information. Check Department of Electricity Development for the newest notice, form, service link, fee, and final instruction.
Office and portal links
Printable checklist
Apply for an electricity transmission-line survey licence
- Licensed company, promoter, project or authorized representative identity
- route and substation concept
- voltage and capacity
- company and technical capability
- Official DoED, ERC, NEA or project application and licence reference
- Official licence, regulatory, study, grid or service fee receipt
- Official source checked on the submission date
FAQ
Official sources
Use these references for final confirmation before applying. Nepal Docs Guide is independent and does not replace official instructions.
- Department of Electricity Development
Government of Nepal · last accessed Jul 12, 2026
The official department site lists survey and generation licences and applications for hydro, solar, wind, biomass, thermal, cogeneration and transmission-line projects, together with notices, citizen-charter and project information. Time-sensitive requirements must still be rechecked before submission.
Need official confirmation?
If your case involves corrections, deadlines, legal use, foreign submission, or a rejected application, contact the relevant official office before paying fees or submitting documents.
Author
Nepal Docs Guide Editorial Desk
Citizen services research team
Our editorial desk turns official notices, portal instructions, and field-tested document workflows into plain-language guides. Every guide is independently written and points readers back to official sources for final confirmation.
Was this guide helpful?
Get update alerts
Join the newsletter placeholder for future reminders when high-priority guides need review.
Related guides
Apply for an electricity transmission licence in Nepal
A plain-language Nepal guide for entities constructing and operating licensed transmission infrastructure who need to prepare a transmission licence application, with evidence, submission, safety, and official-source checks.
Apply for a hydropower survey licence in Nepal
A plain-language Nepal guide for developers proposing to study a hydropower project who need to prepare a hydropower survey licence application, with evidence, submission, safety, and official-source checks.
Apply for a solar power survey licence in Nepal
A plain-language Nepal guide for developers studying a utility-scale or licensed solar project who need to prepare a solar survey licence application, with evidence, submission, safety, and official-source checks.